Turnkey Detached Homes & Garage Conversions

Accessory Dwelling Units (ADUs)

Unlock passive rental revenue or create private living space for family. RGV Development Inc. manages architectural plans, city submittals, Title 24 compliance, independent utility connections, and full construction.

Accessory Dwelling Units (ADUs)
What It Is

Understanding Accessory Dwelling Units (ADUs)

An Accessory Dwelling Unit (ADU) is a secondary, self-contained residential dwelling placed on the same lot as a primary single-family or multifamily home. Also known as granny flats, backyard homes, or in-law suites, ADUs include their own kitchen, bathroom, sleeping area, and independent entrance.

California state law streamlines ADU approvals, allowing homeowners in Los Angeles, Orange County, Riverside, and San Bernardino to add rentable or family living space without rezoning the lot. Detached ADUs, attached ADUs, garage conversions, and junior ADUs (JADUs) all qualify under current state legislation.

RGV Development Inc. designs and builds ADUs engineered to maximize your lot's usable square footage while complying with local setback, height, and parking requirements. We handle every phase — from soil testing and Title 24 energy modeling to city permit submittal and turnkey construction.

What It's Good For

Is This Right For Your Property?

Passive Rental Income

Generate $2,500–$4,500/month in long-term rental revenue from underused yard or garage space.

Multi-Generational Living

Keep aging parents or adult children close with a private, accessible living space on your property.

Property Value uplift

A permitted ADU can add $150,000–$500,000+ in appraised value and boost overall lot desirability.

Short-Term Rentals

In compliant zones, ADUs unlock Airbnb and VRBO income near top Southern California destinations.

What We Offer

Our End-to-End Process

01

Feasibility & Site Visit

Free on-site consultation, lot measurement, setback analysis, and rental-yield estimate specific to your neighborhood.

02

Architectural Design

Custom floor plans, elevations, and Title 24 energy compliance drafted by our in-house design team.

03

Permitting & Submittals

We manage city submittals, plan checks, utility connections, and impact-fee waivers under state ADU law.

04

Turnkey Construction

Foundation, framing, MEP, finishes, and final inspection — delivered move-in ready in 6–12 months.

Why Choose Us

What's Included In Every Build

Full Architectural Drafting & Permitting
Independent Sub-metering for Electric & Gas
Custom Kitchenette & Modern Bathrooms
Title 24 Energy Compliance Built In
Turnkey Construction within 6–12 Months
Waived Impact Fees Under State ADU Law
Frequently Asked

Accessory Dwelling Units (ADUs) Questions

Ready To Start Your Accessory Dwelling Units (ADUs)?

Get a free, no-obligation estimate from Oscar and the RGV Development Inc. team. We'll review your property, answer your questions, and map a clear path forward.